painting line:on-line→ Cottrell process→Primer coating→levelling property→surface paint spraying→levelling property→dry beside or over a fire→cooling→down-line
Paint spraying main oil spray paint room、Water curtain paint room,It is widely used in bicycles, electric cars, car plate springs, and the surface coating of large loaders.
The seven major components of the painting pipeline mainly include:pretreatment equipment , powder spraying system , paint spraying equipment , drying furnace , heat source system , electric control system , suspension conveying chain and the like .
Dongguan headquarters: Dongguan Zhong Ya Zhuo Ke Industrial Equipment Co., Ltd.
Address: No. 4 Minchang Road, 6th Lane, Nanzha Sixth Industrial Zone, Humen Town, Dongguan City, Guangdong Province
Tel: 0769-81919829 (50 line)
Fax: 0769-81919209
Service hotline: (086)-13823757288
E-mail: wxzk@szzkgy.com
Web site: www.szzkgy.com